McDonald Steel Starts New Walking-Hearth Reheat Furnace
Youngstown — Posted on August 4, 2007 at 7:20 am “McDonald Steel Corp. has started up a new, $7.5-million walking-hearth reheat furnace designed and built by Bricmont Inc. (www.bricmont.com) to replace two 80year-old pusher furnaces. The Youngstown, OH, operation, comprising a part of the former U.S. Steel McDonald Works, produces engineered steel bars and shapes from long and flat products.”
Popularity: 3% [?]

Tweet This
Digg This
Save to delicious
Stumble it






